Inspection
Know what
you’re accepting
LIBRA’s vendor inspection services check materials, components and equipment at the supplier’s facility against project requirements. Checks and reporting follow the agreed fabrication stage and acceptance criteria.
Vendor inspection · Fabrication checkpoints · Inspection records
The right check
at the right stage
Choose the stage that fits your requirement. The inspection scope is defined for the specific equipment and project.
Check incoming
materials
Compare material identification, markings and available certificates with the purchase requirements. Record missing traceability links before fabrication makes the material harder to identify.
Check fabrication
and assembly
Verify visual, dimensional and assembly requirements at the agreed Inspection & Test Plan (ITP) checkpoints. Plan attendance before a feature is covered or becomes inaccessible.
Check before
release
Compare the completed equipment and required records with the agreed requirements. Identify outstanding checks, missing documents and unresolved findings for the party responsible for release or acceptance.
An ITP connects the check, reference, intervention point and required record. Hold and witness points have different attendance and progression arrangements: apply the definitions, notice periods and release rules in the project documents.
From the check
to a usable record
The report lets the receiving team reconstruct what was checked, against which requirement and with what result, including the extent and limits of the examination.

What the inspection
makes clear
A practical record of what was checked and what was observed.
Item or equipment reference, material identification where relevant, fabrication stage, documents and revisions used, and checks performed. Identify anything outside the agreed scope.
Connect each finding to the requirement and supporting record. Distinguish a deviation from a clarification, then identify the action needed and the party responsible for the next decision.
Define the work
before the visit
Connect the drawing with the purchase specification, applicable ITP and current fabrication status. Together, they establish which checks need attendance and which records can be reviewed.

Look closer
See what
matters
Share the requirement
Share the item list, supplier location, fabrication stage and required date, with the specification, drawing and ITP available. Flag missing documents or restricted access.
Agree the inspection plan
Agree the checks, extent, acceptance criteria and reporting. Clarify notice periods, report recipients and who may accept a deviation or release a hold point.
Record and follow up
Record findings and unperformed checks with their item references and limitations. Where follow-up is included, link the supplier’s response or new evidence to the original finding.
Your next checkpoint
starts with a clear scope
What needs
checking?
Describe the equipment and the check you need, even if the scope is not yet final.
What to include
Supplier location, required date and available specifications help assess scope and operational availability.
Discuss your inspection
Leave the stage open if it is not yet defined.
Inspection activities
and reporting
Review the activities that may be relevant to your materials, equipment and project requirements.
Vendor inspection can cover incoming material identification and traceability, fabrication and assembly checks, attendance at specified ITP points, final inspection and related records. Scope follows the equipment and project requirements.
For example, a batch may require a link between material markings and certificates; assembled equipment may require dimensional checks. These are inspection questions, not claims that one visit covers every item or stage.
The report connects item → requirement → check → finding. It identifies date and location, documents and revisions, activities performed, results and open points. Sampling, unavailable records and access limits qualify the result.
A certificate alone does not establish conformity if it cannot be linked to the item. Report acceptance, equipment release and shipment authorisation remain separate decisions under the assignment.
Industrial equipment
specific checks
Explore the industrial contexts to place the equipment and its inspection requirements.

Oil & Gas
Pressure equipment, valves, pipelines and associated project components.

Mechanical & Electrical
Mechanical components, electrical systems and control panels.

Renewable Energy
Equipment and components for wind, solar and hydroelectric projects.

Industrial Manufacturing
Fabricated equipment and production processes.
Before you enquire
Share the equipment, location and current stage. These provide a starting point for discussing checks, available documents and timing.
Non-destructive testing (NDT) requires its own method, procedure, personnel qualifications and acceptance criteria. Witnessing a test or reviewing its report is different from performing the examination. Identify the component or weld and the role required when planning NDT and inspection together.
Inspection checks conformity of specified materials or equipment. Expediting follows order progress; Vendor Assessment reviews supplier capability and quality controls. If you need more than one activity, describe the issue.
Start with
your next checkpoint
Equipment. Supplier. Required check.